Before You Start: Who This Checklist Is For
-
The Checklist
-
Step 1 — Pin Down the Model Family Before You Compare Prices
-
Step 2 — Decide Hire vs. Buy on Total Cost, Not Day Rate
-
Step 3 — Demand a Configuration Sheet, Not a "Standard Quote"
-
Step 4 — Check Where the Parts Actually Come From
-
Step 5 — Make the Paperwork Do Its Job
-
Step 6 — Walk the Site Before the Crane Arrives
-
Step 7 — Read the Clauses That Cost Money Later
-
Step 8 — Agree the Handover Acceptance Criteria Upfront
-
Step 1 — Pin Down the Model Family Before You Compare Prices
-
Notes and Common Mistakes
Before You Start: Who This Checklist Is For
This is for project managers, procurement leads, and site supervisors who are close to signing a Potain crane hire agreement or a purchase order for a Potain tower crane. It assumes you already know roughly what the site needs and quotes are starting to come in.
One quick note on search terms. If you typed "crane" into Google and landed on a page about the crane vs heron debate, you're not the first. The word does double duty, and a surprising amount of tower crane research gets buried under bird articles, power tool ads, and pickup truck listings. Filter that noise out first—then use the eight steps below.
I've been doing quality and vendor compliance review for just over four years. Last year I reviewed roughly 190 equipment handovers and supplier submissions across our projects, and I rejected about 12% of first deliveries. Almost none of those rejections were about the machine being bad. They were about the spec sheet and the actual machine not lining up. Most were avoidable with a checklist.
The Checklist
Step 1 — Pin Down the Model Family Before You Compare Prices
"Potain tower crane" is not a single product. The family splits into flat-top top-slewing machines (the MCT and MDT lines), luffing-jib units (the MR series), and self-erecting cranes (Igo and Hup). A Potain crane hire quote for an MCT and a quote for an MR are not comparable numbers, even when the monthly rate looks similar.
What to check:
- Jib length at the working radius you actually need
- Max load at the hook versus tip load at full jib
- Freestanding height versus anchored height
- Whether the machine climbs with the structure or stays static for the project duration
Jib length. Max load. Tip load. In that order—and the third one is where the surprises live. Most buyers focus on the headline max load and completely miss tip load at full radius, which is the number that decides whether you can actually pick the panel at the far corner of the slab.
Step 2 — Decide Hire vs. Buy on Total Cost, Not Day Rate
Potain crane hire looks cheap on a monthly rate and gets expensive in mobilisation, demobilisation, standby days, and overtime. Potain tower cranes for sale look expensive upfront and get cheaper the longer the project runs. Neither number means anything until you put them in the same column.
Run it as a total-cost comparison: base rate, transport in and out, erection and dismantling, foundation or ballast work, operator cost if it's bundled, standby terms, and the realistic duration of your project plus a buffer. My rule of thumb after four years of this: on anything under roughly nine months of on-site work, hire usually wins. Past that, the crossover point moves fast.
To be fair, the cheapest option isn't automatically wrong—budgets are real, and not every project needs a new machine. But I've watched a $9,000 saving on a used unit turn into a $31,000 problem when a gearbox failed mid-pour and the replacement sat in customs for eleven days. That's not a hypothetical. That's a project schedule.
Step 3 — Demand a Configuration Sheet, Not a "Standard Quote"
Here's something vendors won't tell you: a "standard quote" usually means standard for their paperwork, not standard for your site. The base number often excludes the jib length you need, the ballast configuration, the climbing equipment, and the anchor cage.
Ask for a line-item configuration sheet with every element named: jib length, counter-jib length, mast sections, foundation type, ballast weight, hook height, power requirement, and the exact model designation with the serial prefix. If the quote doesn't name it, treat it as not included.
This is the single step that has saved me the most money over the years. It's boring. Do it anyway.
Step 4 — Check Where the Parts Actually Come From
A tower crane is a twenty-year asset with a maintenance schedule attached. The question everyone asks is "what's the lead time on the machine?" The question they should ask is "what's the lead time on a slewing ring, and where does it ship from?"
Potain's dealer and parts network is one of the genuine advantages of the brand—but only if your supplier is actually plugged into it. Ask: which authorised dealer supports this machine in this region, what's the standard parts lead time, and what happens if a non-stock component is needed mid-project. Get it in writing. Non-OEM parts exist and some of them are fine; the problem is when nobody documents which ones are on the machine.
Step 5 — Make the Paperwork Do Its Job
Compliance is where first deliveries get rejected. For a tower crane, you want the CE marking and declaration of conformity, evidence of conformity with EN 14439 (the European tower crane safety standard), the load test certificate, the most recent thorough examination report, and the maintenance log. As of January 2025, most of our contracts also require a signed handover checklist with photographic evidence of each inspection point.
If a supplier hesitates on any of those, that hesitation is information. Verify current requirements against your local regulator before signing—the details vary by jurisdiction and they do change.
Step 6 — Walk the Site Before the Crane Arrives
Access is the step people underestimate. You need a route wide enough for mast sections and counterweights, and a hardstand that can take the delivery vehicle's axle load. Trying to move crane components with a half-ton pickup is the equipment equivalent of buying a Shelby truck to do a flatbed's job—it looks capable until the load actually shows up.
Power is the other one. Confirm the kVA available at the panel, the distance to the crane base, and who supplies the cable. And keep your tool expectations realistic: a DeWalt drill belongs in the site toolbox, but it does not belong anywhere near the anchor bolt torque spec. That's a calibrated torque wrench and a documented procedure, not a cordless driver and a good attitude.
Step 7 — Read the Clauses That Cost Money Later
The rate is on page one. The money is on page four. Look specifically for: standby day definitions, overtime triggers, weather-day treatment, the demobilisation notice period, and who pays for foundation design changes. A one-line clause about "site readiness delays" can cost more than the monthly rate difference between two suppliers.
Step 8 — Agree the Handover Acceptance Criteria Upfront
Before the machine goes up, agree in writing what "accepted" looks like. Load test witnessed by whom, against what chart, with what documentation delivered at what point. My team uses a two-page acceptance sheet—one page for the machine, one for the paperwork. If it isn't on the sheet, it isn't accepted.
Notes and Common Mistakes
The biggest recurring error I see is comparing quotes that aren't the same scope. Two "Potain tower crane" prices can differ by 40% purely because one includes erection and one doesn't. Normalise the scope before you negotiate the number.
The second is skipping the parts conversation because the machine is new. New machines still break, and the lead time on a component doesn't care how fresh the paint is.
Third—and this one is cultural—don't let the lowest bid set your expectations for the others. It's a data point, not a benchmark.
One caveat: this checklist reflects what I've learned reviewing equipment handovers through Q4 2024. Pricing, standards, and dealer coverage shift, sometimes quickly. Verify current rates and compliance requirements directly with the supplier and your local regulator before you commit budget.